
URW706C, brought up by the tower crane beside it and set up on top of the building.
The machine is used for lifting materials up and down since the winching is faster the tower crane to shorten the working hours.
URW706C, brought up by the tower crane beside it and set up on top of the building.
The machine is used for lifting materials up and down since the winching is faster the tower crane to shorten the working hours.